logo

Qingdao Senwang Steel Construction Co., Ltd qdsw87@qdwsteel.cn 86--18669803758

Qingdao Senwang Steel Construction Co., Ltd company profile
Products
Home > Products > Steel Structure Warehouse > Fast Install Prefabricated Steel Warehouse with 0.35kn/m2 Wind Load and 30000ton/Year Capacity

Fast Install Prefabricated Steel Warehouse with 0.35kn/m2 Wind Load and 30000ton/Year Capacity

Product Details

Brand Name: Senwang

Certification: CE

Model Number: Q235, Q355B

Document: Qingdao Senwang Steel Struc...re.pdf

Payment & Shipping Terms

Minimum Order Quantity: 500㎡

Price: Custom

Packaging Details: Standard

Delivery Time: 25-30 Days

Payment Terms: T/T L/C

Supply Ability: 8000tons/Month

Get Best Price
Product Details
Highlight:

Fast Install Steel Structure Warehouse

,

0.35kn/m2 Wind Load Prefabricated Steel Warehouse

,

30000ton/Year Capacity Steel Storage Building

Production:
50000tons/Year
Window:
PVC Or Aluminum Alloy Frame Window
Wind Load:
0.35kn/m2
Factory Address:
Tieling, Liaoning
Installrion:
Fast Install
Surface Treatment:
Painting
Production Capacity:
30000ton/Year
Productname:
Steel Structure Warehouse
Production:
50000tons/Year
Window:
PVC Or Aluminum Alloy Frame Window
Wind Load:
0.35kn/m2
Factory Address:
Tieling, Liaoning
Installrion:
Fast Install
Surface Treatment:
Painting
Production Capacity:
30000ton/Year
Productname:
Steel Structure Warehouse
Product Description
Steel Structure Warehouse
This prefabricated steel structure warehouse offers an efficient and durable solution for modern storage and industrial needs. Engineered with precision using advanced software including STAAD-Pro, RamConnection, and Midas/Gen, it ensures optimal performance and safety under various environmental conditions.
Key Features
Wind Load Resistance: 0.35 kN/m²
Production Capacity: 50,000 tons per year
Foundation Type: Concrete
Installation: Fast Install
Factory Location: Tieling, Liaoning
Technical Specifications
Parameter Specification
Product Resistance Corrosion Resistant
Key Feature Prefabricated Warehouse
Window Type PVC or Aluminum Alloy Frame Window
Raw Steel Material Q235B, Q355B, ASTM A36
Structure Type Light Steel Structure
Software Used STAAD-Pro, RamConnection, Midas/Gen
Applications
The Senwang Steel Structure Warehouse is ideal for various industrial and commercial storage needs across manufacturing, logistics, agriculture, and retail sectors. It serves perfectly as storage space for raw materials, finished goods, machinery, and equipment, providing an organized and secure environment.
Customization Options
  • Structure Types: Light Steel Structure
  • Window Options: PVC or Aluminum Alloy Frame Windows
  • Raw Materials: Q235B, Q355B, ASTM A36
  • Minimum Order Quantity: 500㎡
  • Delivery Time: 25-30 days
  • Payment Terms: T/T and L/C
Support & Services
Comprehensive technical support including installation manuals, structural design assistance, on-site technical guidance, maintenance advice, warranty services, and staff training sessions to ensure optimal performance throughout the warehouse lifecycle.
Packing & Shipping
Components are securely wrapped with rust-proof materials and cushioned with foam padding. Heavy-duty wooden crates or steel frames provide extra protection. Flexible shipping options include sea freight, air freight, and land transportation with tracking information provided.
Fast Install Prefabricated Steel Warehouse with 0.35kn/m2 Wind Load and 30000ton/Year Capacity 0
Frequently Asked Questions
What model numbers are available for the Senwang Steel Structure Warehouse?
The warehouse is available in model numbers Q235 and Q355B.
Where is the Senwang Steel Structure Warehouse manufactured?
The warehouse is manufactured in China.
What certifications does the warehouse have?
The warehouse is CE certified, ensuring compliance with European safety and quality standards.
What is the minimum order quantity?
The minimum order quantity is 500 square meters.
What are the payment terms and delivery time?
Payment terms include T/T and L/C, with delivery typically taking 25-30 days after order confirmation.