Qingdao Senwang Steel Construction Co., Ltd qdsw87@qdwsteel.cn 86--18669803758
This photo captures the on-site erection phase of our steel structure workshop project. The rigid steel main frame system, including H-section columns, beams, purlins and bracing members, is being assembled by our experienced installation team. All steel components are prefabricated and pre-treated in our factory, with precise holes and connection points reserved for fast bolt connection on site.
The whole frame adopts a stable portal frame structure, which can bear wind load and other external loads efficiently. The bracing system is reasonably arranged to enhance the overall rigidity and seismic performance of the building. Compared with traditional concrete buildings, this prefab steel frame greatly cuts down construction time and reduces site wet work.
We strictly control every step of installation to ensure verticality and positioning accuracy of each steel member. After the frame erection is completed, roof and wall panels will be installed sequentially. We provide full technical guidance for overseas installation teams. Whether you need an industrial workshop, warehouse or production plant, we can customize the steel frame design according to your local building code and load requirements. Contact us to get your project plan and quotation.