PROJECT CASE STUDY

Project Snapshot
Industrial steel building, 12,500 sqm, delivered to a manufacturing and logistics client in Saudi Arabia. Total steel weight 860 tons. Clear span 42 m, eave height 12 m, two 20 ton overhead cranes. Structural system Q460 high strength portal frame with tapered built up columns and welded H sections. Delivery cycle 95 days from drawing approval to loading. Designed and fabricated to AISC, EN 1090 and CSA, with full compliance to local Saudi building code.

Client Pain Points
The client was expanding a coastal plant and hit four hard limits at once. The 42 m clear span had to carry heavy roof loads and two cranes with no intermediate columns. The site sits 1.2 km from the shoreline, so corrosion was the main risk to service life. Local authority review demanded complete compliance documentation in both English and Arabic. The construction window was only four months, and the client had no in house detailing team.

Customized Solution
We handled design, detailing, fabrication and site support as one package. BIM modelling resolved every connection and crane runway interface before cutting began, so no clash reached the shop floor. Q460 high strength heavy steel cut the section weight while keeping the span clear. Fully automatic production lines held tolerance and output at the same time. A complete set of shop drawings, erection plans and anchor bolt layouts went out with the first shipment. Our engineers provided remote and on site installation guidance through the whole erection phase.

Production and Delivery
CNC cutting, automatic welding, shot blasting to Sa 2.5, zinc rich primer plus top coat, then loading and shipping. Every stage is documented with photos and short videos you can show clients directly.

On Site Result
Completed building, aerial panorama, interior overhead crane in operation, facade and cladding details. The plant was handed over on schedule and is running at full load.

Value Delivered
Twelve percent steel weight saving against the original scheme. Thirty days earlier handover than the client plan. Full compliance with local energy and safety codes. Thirty year corrosion warranty on the primary structure.

Client Testimonial
The span, the schedule and the documentation were the three things we worried about most, and all three were solved before we signed. The building went up faster than we expected and the paperwork passed local review on the first submission.