Heavy Steel Structure Overseas Project Case
Project Basic Information
Project Country: Southeast Asia coastal area
Building Area: 12600 ㎡
Total Steel Consumption: 1680 tons
Structure Type: Heavy‑steel portal frame industrial workshop, equipped with internal overhead crane system
Delivery Cycle: 14 weeks from drawing confirmation to container loading completion
Applicable Standards: EN1090, AISC design specification
Customer Pain Points
The project required large‑span interior space with heavy overhead crane load requirements. Located in coastal high‑salt‑humid zone, the building demanded superior anti‑corrosion performance for long‑term service. Local construction regulatory requirements were complicated. The customer faced tight overall construction schedule to put production into operation as scheduled. The original conceptual drawings existed structural collision defects, and the customer lacked capacity for professional drawing deepening and international standard conversion.
Customized Solution
We delivered one‑stop integrated heavy steel structure solution. Professional BIM digital design was adopted for 3D modeling, clash detection and full set drawing deepening, realizing accurate engineering calculation and standard conversion. Q460 high‑strength heavy steel was selected as main frame material to satisfy large‑span heavy‑load working condition. Relying on fully‑automatic heavy steel production line, we guaranteed component machining precision. We supplied complete drawing documents for local approval and provided remote plus on‑site overseas installation guidance for the whole construction phase.
Production & Delivery On‑site Shooting
All steel components went through CNC cutting, automatic welding, shot blasting and anti‑corrosion painting procedures inside factory. Real‑world photos and short videos cover each production procedure, together with container loading and ocean shipment footage for cross‑border transportation.
Final Project Delivery Effect
Completed building real‑scene photos and aerial panoramic shots show the overall outline of heavy‑steel workshop. Interior pictures display stable running of heavy‑duty overhead crane. Exterior close‑up shots present uniform anti‑corrosion coating and neat facade details. The whole structure operates steadily under local coastal environment.
Cooperation Value Summary
Our integrated design‑manufacture‑delivery mode effectively cuts customer comprehensive project cost. Prefabricated manufacturing greatly shortens total project period and helps customer launch production ahead of time. The whole project strictly complies with local safety and energy‑saving building codes and passes official acceptance. Marine‑grade anti‑corrosion treatment provides 30‑year anti‑corrosion guarantee for steel main structure, lowering later maintenance expenditure.
Customer Testimonial
“We are satisfied with this heavy‑steel cooperation. Their BIM team solved drawing and standard conversion obstacles efficiently. Automated production ensures high component quality. Installation guidance support is responsive and professional. The finished workshop meets our heavy‑load production demand and local building requirements. We intend to keep long‑term strategic cooperation for future projects.”