logo

Qingdao Senwang Steel Construction Co., Ltd qdsw87@qdwsteel.cn 86--18669803758

Qingdao Senwang Steel Construction Co., Ltd Company Profile
Cases
Home > Cases >
Company Cases About 15,000 SQM Pre-Engineered Steel Structure Logistics Warehouse in South America

15,000 SQM Pre-Engineered Steel Structure Logistics Warehouse in South America

2026-11-13
Latest company cases about 15,000 SQM Pre-Engineered Steel Structure Logistics Warehouse in South America

Project Overview:

  • Location: South America

  • Project Type: Logistics & Distribution Warehouse

  • Dimensions: 150m (L) × 100m (W) × 12m (Eave Height)

  • Total Area: 15,000 Square Meters

The Challenge:
The client required a large, column-free storage space to maximize racking efficiency. Additionally, the project site is located near the coast, requiring an extremely high level of anti-corrosion protection. Furthermore, the client needed the structure to be delivered and installed rapidly to meet a tight operational deadline.

Our Solution:
We provided a complete turnkey solution (PEB - Pre-Engineered Building) customized to the client's exact requirements.

  • Structural System: High-strength Q355B steel portal frames with a 30-meter clear span, eliminating internal columns and maximizing storage capacity.

  • Anti-Corrosion System: Hot-Dip Galvanizing (HDG) with a minimum zinc layer of 85μm (compliant with ASTM A123), plus a heavy-duty epoxy coating system to withstand the coastal humidity.

  • Roof & Wall System: 0.5mm high-rib standing seam roof sheets with 100mm fiberglass insulation. The walls utilized 50mm fireproof Rockwool sandwich panels to meet local fire safety codes.

  • Accessories: Included skylight panels for natural illumination, industrial ridge vents for ventilation, and heavy-duty roller shutters.

Why Choose Us? 

  1. Rapid Delivery: Advanced CNC manufacturing reduced the production time to just 35 days.

  2. Easy Installation: All steel members were pre-drilled and clearly marked with assembly codes, saving 30% of on-site labor time.

  3. Quality Assurance: Supplied with full Mill Test Certificates (MTC), third-party inspection reports, and a 20-year structural warranty.

  4. Cost-Effective: Optimized steel design saved the client 10% on overall steel consumption without compromising structural safety.

Events
Contacts
Contacts: Ms. Marry wang
Contact Now
Mail Us